Use this guide to prepare a pole lifter compatibility review. It helps identify the information to send; it does not automatically approve a lifting operation.
Reference envelope
The source sheet lists 12 m light poles and a 300 kg rated load. It also lists M16, M18, M20, M22, M24, with a flange hole span of 180–260 mm.
These values are inputs to review. Pole geometry, assembled attachments and the connection arrangement still matter. Some flange-diagram terminology requires engineering clarification.
Return to the full specificationImportant distinction
M16, M18, M20 and M22 are the bolt sizes in the standard included configuration. M24 is shown in the compatibility table and must be discussed separately.
Site setup, anchoring, operator position and clearances need a reviewed operating manual. This guide is for project preparation.
Connection / Quick check
Compare your flange hole span and bolt size with the listed equipment range. Keep the dimensioned drawing ready for a complete connection review.
Listed span: 180–260 mm. Confirm how your drawing defines the measurement.
Specification comparison
The span and bolt size match the listed specifications. Send the base drawing to confirm the connection.
A dimension check supports project preparation. The assembled load, foundation and site also need review.
Information to prepare
A clear drawing and a few project details make the initial review more useful. Unknown values can be left open for follow-up.
Provide the height, material and total assembled weight—including any luminaire, bracket, battery, solar panel or other attachment. A height alone does not establish the lifting conditions.
Include flange dimensions, hole positions, hole sizes, plate thickness and anchor bolt specification. A dimensioned drawing is more useful than a description such as “standard base”.
Identify the foundation type and how the pole is connected. Ground and anchor conditions must be reviewed; the equipment sheet does not establish a direct-burial solution.
Share access, working space, surface conditions and any relevant site restrictions. The equipment needs a project-specific review rather than an assumption based on portability.
Add the application, quantity and destination. If information is missing, say so: the inquiry can start before every drawing is ready.
Your project / Next steps
Choose the next step that fits your project. Explore the equipment, check your connection or discuss a quotation.
Download the dimensions, module weights and included components for your project comparison.
Download CSV ↓Check the flange dimensions, then share your drawing and project details for a configuration review.
Check compatibility →Send the application, quantity and destination. Start with the information you have; drawings are optional.
Request a project quote